ESL recently installed and commissioned 0.5 MW Solar Power Plant EPC at Zephyrs Textile Mills with Trina 490Watt Panels and Huawei Invertors.

Zephyrs Textile Mills

ESL recently installed and commissioned 0.5 MW Solar Power Plant EPC at Zephyrs Textile Mills with Trina 490Watt Panels and Huawei Invertors.
The solar plant installation at ZTL is on Dome/Shell valley beams of mill’s warehouse that was completely a nonutilized area.
The plant is synchronized with WAPDA and their existing gensets and is capable to export extra energy to national grid.
The LCOE (Levelized Cost of Energy) of the plant is Rs 2.9 /ekwhr and the payback is 3.9 years.
This solar solution is in addition to the 1MW Cummins Lean Burn Gas set supplied to Zephyrs.

Project Details

DATE

December 18th, 2015

CLIENT

Zephyrs Textile Mills

PROJECT TYPE

Solar Power

CONTRACTOR

Energy Solutions (Pvt) Ltd.

Project Gallery