ZONG CMPak
Connecting Pakistan with 21.5 MW — ESL & Zong CMPak Leading the Way
This marks a landmark achievement in Pakistan’s telecom power infrastructure. ESL, in partnership with Zong CMPak, has successfully delivered a nationwide backup power project ensuring that critical sites and datacenters stay connected without compromise.
From design to commissioning, ESL teams executed on time and at scale. At Zong’s headquarters datacenter, two 2500kVA uptime-certified DCC generators were installed for maximum reliability. Regionally, two 2250kVA units and one 1410kVA unit secure operations, while nationwide, more than 412 turnkey microgrid solutions (33kVA each) now power BTS sites across cities and remote regions — together representing over 21.5MW of backup capacity.
This infrastructure not only safeguards today’s connectivity but also prepares Zong’s datacenters for the future demands of AI, IoT, and machine learning. With ESL’s engineering expertise, Zong CMPak now stands at the forefront of Pakistan’s telecom power evolution.
Rooftops, Hilltops & Beyond – Power Across Every Landscape
The nationwide deployment of 412 gensets for BTS sites showcased ESL’s ability to deliver reliable power solutions in every kind of environment — from remote hilltops to urban rooftops. Each site was carefully planned and engineered to ensure stable foundations, safe installations, and long-term performance.

ESL ensured reliable operations nationwide, delivering uninterrupted performance even in the toughest conditions. With enhanced training, ESL’s field teams continue to uphold dependable solutions across all terrains — building a resilient, future-ready power network that keeps Zong CMPak’s connectivity strong across Pakistan.
