Cyber Internet Services Private Limited (Cybernet) DCC Power Solution
Case Study: Energy Solutions (Private) Limited supplied and commissioned AKSA 2 x APD715P kVA with Perkins 2806A-E18TAG2 USA Origin and Stamford Alternator to Cyber Internet Services Private Limited. Cybernet DCC is a clear manifestation of ESL-Aksa Capability to supply, install and
Ghani Group goes Green with ESL Renewables!
2.5 MW Solar Power Plant synchronized with existing Diesel Gensets of 3x1250 kVA, equipped with Huawei grid tied Inverters, 20x100KTL, Mono Perc half cut Solar Panels, Aluminium Structure with design life of 25 years.
Telenor Pakistan Mobile Switching Center (MSC) Upgradation Project 2021- DCC Power Solution
Case Study: Energy Solutions (Private) Limited supplied and commissioned 2250kVA Aksa DCC Power Solution at Telenor Pakistan’s Mobile Switching Center (MSC) Upgradation Project in Karachi. This happens to be one of the largest Data Center Projects in Pakistan. Telenor
Participation in Textile Asia Exhibition Faisalabad Representing ESL Diesel and Renewable Products
Energy Solutions (Private) Limited represented Aksa Power Generation and ESL Renewables at Textile Asia Exhibition, Faisalabad. The three day event was a healthy platform for boosting national and international exposure and interaction with customers, exhibitors, textile and engineering experts
ESL Participated in Textile Asia Exhibition Faisalabad representing Cummins Lean Burn Gas Generators.
The three day event was held from March 26-March 28, 2022. Cummins gas generators grabbed the attention of a large number of visitors.
Participation in IEEEP Symposium, 2022
ESL participated in the 36th Multi-topic International Symposium organized by the Institute of Electrical & Electronics Engineers Pakistan (IEEEP) on March 16 & 17, 2022 at Hotel PC Karachi. The 2 day event consisted of panel discussion and technical